SAP BPC Consolidation migration project

The objective was to migrate the current BPC MS consolidation environment to the BPC 10.1NW version. All existing reports were rebuilt using the latest EPM technology and all data flows were setup to load the data directly from SAP to SAP BPC. Also, the journal model was integrated into the main model in order to have better reporting more details on the journal postings.